Mersin Port Hit by 20-Day Delays as Hormuz Cargo Diversions Overwhelm Turkish Gateway
Turkey's Mersin port is struggling under a wave of diverted cargo linked to the ongoing conflict in the Middle East, with waiting times reportedly reaching as long as 20 days. Iranian transport officials say the congestion stems from freight being rerouted away from the Strait of Hormuz over the past several months, and local port authorities confirm the facility is now running near full capacity.
What Is Driving the Congestion?
According to Ehsan Malekzadeh, president of Iran's International Transport Association, a large share of Iran's international freight has shifted to Mersin and the nearby port of Iskenderun over the past seven to eight months. He said this influx has pushed demand at Mersin 30% to 40% above the port's normal capacity. Restrictions on shipping through the Strait of Hormuz, a key chokepoint for Gulf trade, have pushed shippers to look for alternative routes and gateways, with Mersin becoming one of the main beneficiaries of that shift.
How Bad Are the Delays?
Malekzadeh described a 20-day wait as "unheard of" for the port, pointing to the scale of disruption now being felt by operators and cargo owners alike. Serdar Yıldızgörer, president of the Mersin Chamber of Commerce and Industry, acknowledged the problems and put the port's current capacity utilisation at roughly 90%. The congestion is affecting multiple stages of port operations, including vessel berthing, container discharge, and subsequent loading, each of which adds further delay and cost.
What Is Being Done About It?
Talks are underway between Mersin port authorities, the local chamber of commerce, and Iranian transport representatives to address the bottleneck. Malekzadeh offered support for additional infrastructure investment to help relieve pressure on the port. A meeting involving customs officials, agricultural inspectors, and port authorities is scheduled this week to look for ways to speed up cargo handling. Separately, Mersin International Port, operated by a consortium led by Singapore's PSA International along with IFM Investors and Turkey's Akfen Holding, has already committed $455 million to an expansion project known as East Med Hub 2. The project is intended to raise the port's annual container capacity from 2.6 million TEU to 3.6 million TEU, though it is unclear how quickly that capacity will come online relative to the current surge in demand.
What This Means for Shippers and Cargo Owners
For shippers and freight forwarders routing cargo through Mersin, the congestion points to longer transit times and less predictable schedules in the near term. Vessels waiting to berth and containers stuck in queues for discharge or loading can translate into missed connections, higher demurrage and detention charges, and tighter windows for onward inland transport. Businesses relying on Iranian trade routes that have shifted toward Mersin and Iskenderun should plan for extended lead times and build in buffer days when booking shipments. Close tracking of vessel and container status will be particularly important while the port works through this backlog, and shippers may want to confirm berthing windows and discharge estimates directly with carriers or forwarders rather than relying on standard transit assumptions. Until the capacity expansion is completed or the underlying diversions ease, congestion at Mersin is likely to remain a factor for anyone moving cargo through this corridor.
Sources: splash247.com